Building Energy Modeling using a
BIM
Integrated Workflow
MP4 | Video: 1280x720 | 52 kbps | 48 KHz | Duration: 6 Hours | 1.32 GB
Genre: eLearning | Language: English
Master the golden rules for integrating BIM with energy modeling to provide performance feedback faster and earlier.
This online course teaches you how to use the proven workflow to seamlessly integrate Building Information Models in the energy modeling process. This workflow allows you to deliver results faster and earlier in the design process, while giving you the ability to manage design iterations. All of this can be done with a LEED-compliant energy modeling tool, such as IES VE, TRACE, and OpenStudio, which saves you time by avoiding the rework that would otherwise be necessary from transitioning to this tool. The integration process works by preparing a clean gbXML import file, avoiding errors before they happen. A robust modeling structure is followed to ensure building models are built up correctly from the start.
Deliver Results Earlier. Engage your engineering team earlier in the design process to collaborate on high-performance buildings and receive early LEED insight, even with fast-tracked projects.
Build Energy Models Faster. The streamlined BIM workflow saves you time by avoiding rework, which can lead to significant soft cost savings during the design process.
Perform Design Iterations. Provide quick feedback by managing design updates through the re-integration of BIM for comparative analysis with minimal rework.
Interoperate Between Applications. Learn to build clean models before exporting the gbXML file to avoid integration errors before they happen, yielding predictably good results across many applications.
建筑能源建模使用
BIM
集成的工作流
MP4 |视频: 1280 x 720 |52 kbps |48 kHz |持续时间: 6 小时 |1.32 GB
类型: 电子学习 |语言: 英语
掌握对 BIM 结合能量建模提供绩效反馈更快及更早版本的黄金法则。
这一在线课程教你如何使用经验证工作流无缝集成建筑信息模型的建模过程的能量。此工作流允许您在设计过程中,提供更快和更早的结果,同时使您能够管理设计迭代。所有这一切都可以通过建模工具,如 IES VE、 跟踪和 OpenStudio,从而节省您的时间,避免返工,否则会有必要从过渡到此工具符合 LEED 的能源。通过准备干净的 gbXML 集成过程的工作导入文件,避免错误发生之前。一种鲁棒建模结构遵循以确保建筑模型建立正确地从一开始。
较早前提供的结果。与您的工程团队接洽早些时候在设计过程中合作,在高性能建筑和接收早期的 LEED 洞察力,甚至具有快速跟踪的项目。
更快地构建能量模型。精简的 BIM 工作流程通过避免返工,从而在设计过程中导致显著的软成本节约可以节省你的时间。
执行设计迭代。通过管理通过比较分析与最小返工 BIM 的重新整合设计更新提供快速反馈。
应用程序之间进行互操作。学习如何建立清洁模型之前导出 gbXML 文件以避免集成错误,防患于未然,在许多应用程序可以预见的是不错的成果。