LEAP Bridge Steel CONNECT Edition V18 Update 1 | 597.5 mb
Bentley Systems, has launched LEAP Bridge Steel CONNECT Edition V18 Update 1 (build 18.01.00.22) for the 3D modeling, design, analysis, and load rating of everyday steel bridges.
What’s New in LEAP Bridge Steel CONNECT Edition V18 Update 1 - August, 2018:
The following enhancements and bug fixes are available in this release.
Enhancements
- AASHTO LRFD 8th Edition Updates
- I-Girder Field Splice Design per AASHTO LRFD 8th Edition
- Phase II for PennDOT Design Manual - Part 4 Design Checks
Bug Fixes
This release fixes a number of issues including:
- Error in automatic wearing surface load and quantity calculation
- Defect regarding reporting of capacities in cross-frame report
- A file specific error when performing RSA analysis
Product:
LEAP Bridge Steel
Version:
CONNECT Edition V18 Update 1 ( build 18.01.00.22)
Supported Architectures:
x64
Website Home Page :
http://www.bentley.com
Language:
english
System Requirements:
PC
Supported Operating Systems:
Windows 8.x or 10
Size:
597.5 mb
Password/解压密码
-0daydown
发布日期: 2018-08-20